Shane is making good headway on the new bathroom. He will be putting the tile up soon. It looks great and it is all his idea. He has the shower floor tiled, it is small tiles on the diagonal, and the rest of the floor is about half done. Where the window is behind him, used to be a door, and from the outside you would never know there had been a door there. Except for the cement porch and steps, which isn't going anywhere without a lot of work. He tiled a wonderful corner bench in the shower, I will get a good pic next week. It has some tape on it right now. He took a field trip to Menard's yesterday and gave us a list of possibilities for vanity, lights, etc. So Paul and I drove to Mt. P. and shopped. Can't wait to see it all put together, which might be as soon as Friday! This is so exciting. We needed a new toilet in the cottage the other day and he put it in in about 45 seconds. It just doesn't get any better than that.
Subscribe to:
Post Comments (Atom)
3 comments:
Does he make house calls to Indiana.
No, even Clare is too far.
Man, I agree with Andrea. I am just not quite handy enough to pull off things like that.
Although I have managed to learn how to replace a toilet in about 5 minutes out of necessity.
-Ryan
Post a Comment